What are the 18 documents of Ppap?
PPAP elements
- Design Records. A printed copy of drawing needs to be provided.
- Authorized Engineering Change (note) Documents. A document that shows the detailed description of the change.
- Engineering Approval.
- DFMEA.
- Process Flow Diagram.
- PFMEA.
- Control Plan.
- Measurement System Analysis Studies (MSA)
What documents are in a Ppap?
There are 18 documents that comprise the PPAP:
- Design Records.
- Engineering Change Documentations, if any.
- Customer Engineering approval, if required.
- Design Failure Mode and Effect Analysis (DFMEA)
- Process Flow Diagrams.
- Process Failure Mode and Effect Analysis (PFMEA)
- Measurement System Analysis Studies.
- Dimensional Results.
How many documents are there in PPAP?
18 elements
The PPAP process consists of 18 elements that may be required for approval of production level parts.
How many levels are in PPAP?
PPAP 5 Levels of Submission: Level 1: Part Submission Warrant (PSW) only submitted to the customer. Level 2: PSW with product samples and limited supporting data. Level 3: PSW with product samples and complete supporting data. Level 4: PSW and other requirements as defined by the customer.
What is design record in PPAP?
The ‘Design Records’ could be a drawing of the part. This is normally provided by the customer because they are the ones who would normally design the part and understand its end use. They could also include any functional / material / test specifications that the customer requires. …
Is PPAP mandatory?
A. A PPAP is required for each product line family intended to be supplied for automotive use. Each company and industry has their own product specific definition of a product line family.
Is PPAP part of APQP?
PPAP (Production Part Approval Process) is one component of APQP (Advanced Product Quality Planning).
What is PSW in PPAP?
The Part Submission Warrant (PSW) summarizes the entire PPAP Package. A PSW is required for each part number unless otherwise stated by the customer.
What is control plan in PPAP?
A control plan is a living document that outlines the methods taken for quality control of critical inputs to deliver outputs that meet customer requirements. The document is used in a PPAP if there is a process change or if a new process is implemented.
Who developed PPAP?
Origins and Purpose. PPAP, or Production Part Approval Process, was developed by the Automotive Industry Action Group (AIAG) in 1993 to create a “standard method” as part of the Advanced Product Quality Planning (APQP) process.
How do you fill a PSW?
Part Submission Warrant (PSW)
- Part Information. Part Name.
- Suppliers Contact Information. Name of Supplier and/or Vendor Code.
- The Customers Contact Information. Customers Name and Division.
- Materials Reporting.
- Reason for Submission.
- Requested Submission Level.
- Submission Results.
- Declaration.