What is the CAP project?
Cost Analysis in Practice (CAP) Project is a three-year initiative funded by the Institute of Education Sciences , U.S. Department of Education, in May 2020 to provide free, on-demand tools, guidance, and technical assistance to researchers and practitioners who are planning or conducting economic evaluations to inform …
What was the purpose of cap or Central Arizona Project?
The project was designed to provide water to nearly one million acres of Indian and non-Indian irrigated agricultural land areas in Maricopa, Pinal, and Pima Counties, as well as municipal water for several Arizona communities, including the metropolitan areas of Phoenix and Tucson.
Where does the Central Arizona Project begin and end?
Central Arizona Project | |
---|---|
Coordinates | 34°17′10″N 114°06′13″WCoordinates: 34°17′10″N 114°06′13″W |
Begins | Lake Havasu, La Paz County |
Ends | Pima Mine Road, Pima County |
Characteristics |
What is CAP water used for?
The majority of CAP water is used for agriculture. Native American Tribes: Through a contract with the U.S. Department of the Interior, CAP delivers water to Native American Tribes in central and southern Arizona. The tribes may use their water in their community or lease it to others.
Where does the CAP canal start?
Lake Havasu
What does it look like? Answer: The CAP has 336 miles of fenced canal or aqueduct. The canal begins at Lake Havasu and runs east to Lake Pleasant. It then turns south, skirting the eastern edge of the Phoenix Metropolitan Area, runs through Pinal County and ends 14 miles south of Tucson.
Why was Cap built?
In 1971, the Central Arizona Water Conservation District (CAWCD) was created to provide Arizona a means to repay the federal government for the reimbursable costs of construction and to manage and operate the physical system. CAWCD, commonly referred to as CAP, continues today to strive toward the CAP vision.
Where does the CAP water come from?
CAP delivers water from the Colorado River and holds the junior priority entitlement in Arizona and the Lower Colorado River Basin. Because of the junior priority, CAP’s supply is most vulnerable to shortages and reductions.
Does the cap need electricity to move the water?
It takes about 2.5 million megawatt-hours (MWh) to deliver 1.4 million acre-feet of CAP water each year. That makes CAP the largest single power user in Arizona. In the past, most of the power needed to move this water came from a single source, the Navajo Generating Station, which closed in 2019.
Where does the CAP canal go?
It runs 336 miles from Lake Havasu to Tucson, delivering water to farmers, Native American nations and 50 cities and communities, including Phoenix and Tucson. CAP water is lifted 3000 feet between the canal intake at the river and its end near Tucson.
Where does the CA aqueduct start?
the Banks Plant
The California Aqueduct begins at the Banks Plant. The Aqueduct carries water more than 400 miles, all the way to Los Angeles.
When did Tucson get CAP water?
The longstanding concern about possible cuts to the CAP is that a return to heavy pumping would reverse a trend of significantly rising aquifer levels under the city since the CAP went online here in 2001. Since that year, Tucson Water’s groundwater pumping has decreased dramatically.
How long did the Central Arizona Project take to build?
20 year
Central Arizona Project – CAP. Water: Brought to you by Central Arizona Project. The 336-mile CAP system took 20 year to build, cost $4 billion, and is an engineering marvel that has contributed dramatically to our quality of life and the sustainability of the state’s water supply and economy.